Skip to content
BoreIQTalk to us

Bill every foot and every standby hour.

Job software for geotechnical and environmental drillers. The quote, the job, the daily reports and the invoice are one record, so the invoice goes out the day the job ends.

Built inside a working geotech drilling company. Ten founding customers start in spring 2027.

Animation of boring B-2 being drilled to 25 feet. Each foot, each sample and the standby hour are added to the invoice as they happen. The invoice totals $2,405.00 and is sent the same day.

InvoiceINV-2207
Draft

Riverside lift station

Boring B-2, rig 4. Example job.

Invoice lines, filled in as the boring is drilled
ItemQuantityAmount

Total

$0.00

Money leaks between the rig and the invoice.

Most drillers know the work got done. The trouble is everything between the rig and the bill.

  1. At the quote

    Quotes are slow

    Built in Excel from the engineer's boring plan, with the margin a guess.

  2. On the rig

    Daily reports are paper

    They come back late or not at all, so standby, extra footage and materials go unbilled or get disputed.

  3. At the invoice

    Invoices are retyped

    Rebuilt by hand from those tickets, days or weeks after the rig has moved on.

  4. After the job

    Profit is a guess

    Nobody can say whether a job made money until long after it's over, if ever.

What slips through on your jobs?

Set these to your own numbers. Rates are $200 an hour for standby and $28 a foot for drilling, over a 30-week season.

Rigs running4 rigs
Standby hours a week, per rig, never billed1.5 h
Feet a week, per rig, never billed10 ft

Left in the ground over a season

$69,600 over a season

Standby $1,200 a weekFootage $1,120 a week

One record, from bid to paid.

  1. 1. Quote

    Quote in minutes, not an afternoon.

    Enter the borings and depths from the engineer's plan and the footage lines fill themselves in. Margin shows on every line before it goes out, as a branded PDF from your own address.

    QuoteQ-1042
    Sent
    Client
    Kestrel Engineering
    Site
    Riverside lift station
    Borings
    6 × 25 ft
    ItemQtyPriceMargin
    Mobilization and demob1 ls$950.0045%
    Hollow-stem auger, 0–25 ft150 ft$3,900.0040%
    SPT samples42 ea$1,680.0055%
    Grout and abandon150 ft$1,350.0053%
    Standby, as neededper h$200.00

    Total

    $7,880.00

    Margin

    46%

  2. 2. Job

    Won quotes become jobs, prices and all.

    Borings, rigs and dates carry over from the quote. Nobody retypes a line item, and everyone can see which borings are drilled, which are today and which are still to come.

    JobJ-311
    On site
    From
    Q-1042, won
    Rig
    Rig 4
    Dates
    Oct 13–16
    B-1B-2B-3B-4B-5B-6
    • B-125.0 ftDrilled
    • B-225.0 ftDrilled
    • B-327.5 ft+2.5Drilled
    • B-425.0 ftToday
    • B-525.0 ftPlanned
    • B-625.0 ftPlanned
  3. 3. Daily report

    One report per rig per day, signed on site.

    Crew, hours by category, footage per boring, samples and materials. Standby gets a reason and the engineer's rep signs for it, so it gets billed instead of argued about.

    Daily reportOct 14
    Signed
    Job
    J-311, Rig 4
    Crew lead
    M. Hale
    Hours
    9.0 h
    • Travel 1.0
    • Drilling 6.0
    • Standby 1.5
    • Decon 0.5

    Standby 1.5 h. Waiting on client: site gate locked.

    BoringIntervalSPTMethod
    B-20.0–25.0 ft7HSA
    B-30.0–27.5 ft8HSA

    J. Alvarez, Kestrel Engineering
    Signed on site, 3:58 pm

  4. 4. Invoice

    The invoice builds itself from the reports.

    Quantities come from the signed reports and prices from the job. Every line shows where it came from, and the signed reports go along as backup.

    InvoiceINV-2207
    Sent Oct 16
    ItemQtyAmount
    Mobilization and demobFrom the quote1 ls$950.00
    Hollow-stem augerFrom 4 reports. +2.5 ft at B-3152.5 ft$3,965.00
    SPT samplesFrom 4 reports. +1 sample43 ea$1,720.00
    Standby, waiting on clientFrom the Oct 14 report. Signed by the rep1.5 h$300.00
    Grout and abandonFrom 4 reports152.5 ft$1,372.50

    Backup attached:
    4 signed daily reports

    Total

    $8,307.50

  5. 5. QuickBooks

    Then it lands in QuickBooks Online.

    Customers and invoices push across, and payment status comes back. Your bookkeeper keeps working where they already work.

    QuickBooks OnlineSync log
    Paid
    1. Customer Kestrel Engineering

      Oct 16, 4:12 pm

      Synced
    2. Invoice INV-2207, $8,307.50

      Oct 16, 4:12 pm

      Synced
    3. Payment received

      Nov 3, 9:40 am

      Paid
    Billed $427.50 more than the quote, all of it signed for on site.

Built for muddy gloves.

The field app has one job: the daily report. It's built for a crew lead in muddy gloves, in direct sun, a long way from a cell tower.

Big targets, no typing
The common path is taps: footage, samples, standby and why. It passes the dirty-hands test.
Works with no signal
Everything saves on the phone first and uploads when there's signal again. Nothing is lost.
Opens ready to go
Job, borings, crew and yesterday's depth are already there when the crew lead opens it.
Signed before the rig leaves
The engineer's rep signs on the crew lead's phone and gets the PDF by email on the spot.

The field app arrives in spring 2027. Until then the office enters each day's report from the paper ticket, so crews don't change a thing on day one. Crew leads never see prices, on the phone or anywhere else.

10:42No signal

B-4, Riverside lift station

Rig 4, Oct 15. Job, borings and crew filled in.

Depth0.0ft
Today3 saved on phone
  • Utilities located, B-4 staked
  • Tailgate safety talk, 2 signed
  • Crew on site: M. Hale, T. Ruiz
Try it with

Priced per active rig. Idle rigs are free.

A rig counts as active in any month it has at least one daily report. Park it for the winter and it costs nothing.

  • Unlimited users: owners, office and every crew
  • QuickBooks Online sync
  • AI drafting of quotes and reports, with no credits to buy
  • A 30‑day pilot with hands-on setup
  • Your data, exportable as CSV any time

Your year, rig by rig

Click a month to park or run a rig

Rig 1
Rig 2
Rig 3
Rig 4

You pay for 27 active rig-months, not 48.

Working Parked, free

Ten founding customers

The first 10 contractors get founding pricing, locked for two years, in return for weekly feedback and a reference call. Pilots start in spring 2027.

Apply for a founding spot
  1. B-1
  2. B-2
  3. B-3
  4. B-4
  5. B-5
  6. B-6
  7. B-7
  8. B-8
  9. B-9
  10. B-10

Questions drillers ask.

A rig with at least one daily report in the month. Rigs parked for the winter, or down for repairs, cost nothing that month.

Send the invoice the day the job ends.

Ten founding customers start in spring 2027. Tell us about your rigs and how you bill today, and we'll set up a 30‑day pilot.